Weekly Engineering Blog - Sound Amplification (11|10|16) - Testing the Product

Summary:  During this week, my team and I cut holes through the cups and added hot glue to act as a suction for the cups. We also created our IGNITE presentation and are currently practicing for next week, where we will still have time to practice before we present. Another thing that we did this week was put in the cups and tested out our prototype, which amplified the sound by 1 db.

EDP:  We are currently Modify & Improve Design part of our sound amplification design. 

Image Link(s): 
Jenn, Jaree, Maria, Travis, Kailey, Peter, Celeste, and Brent. "PicMonkey's Photo Editor | Free Online Image Editing." PicMonkey. Jonathan, Josh, Mike, Rachel, Marta, Christina, Heidi, Vanessa, Andrew, 15 June 2016. Web. 10 Nov. 2016. <https://www.picmonkey.com/#collage>.

Trello Board: 

Comments

Popular posts from this blog

Engineering Project Blog - Engineering Design Process (Own Arrangement)

Weekly Blog Post - Asteroid Impact in "Alabraska"

Engineering Careers - Chemical Engineering Hat Project